If an electrical inspector has flagged nm cable that has been run incorrectly you might be tempted to install the conduit then reuse the same nm cable by running it through the new conduit.
Run 3 4 emt attic.
Temporarily attach the lb to the shed and measure from the bottom of the trench to the bottom of the lb fitting.
A conduit fill table guide including trade size and wire size and conductor size.
Also put a 1 8 hole in the bottom of the lr to make sure that water can get out of it instead of.
Hundreds of electrical products and tools to select from.
A 3 4 inch conduit can hold sixteen 12 gauge wires or twenty two 14 gauge wires.
National electrical code appendix c table c1 shows how the maximum number of wires in conduits including emt electrical metallic tubing this information is based upon nec table 1 chapter 9.
My question is about the sub feeders run through the attic with schedule 40 electrical pvc.
Instead of that i would use a box to transition to 6awg thwn in 3 4 emt in the attic then run the emt out of the house and lb the run down to a lr body that goes into the right side of the box right above where the service wires go in.
Nm cable inside conduit.
Most electrical contractors as i will use emt or what are the most efficient types of romex style cables seu use m c cable tray.
An electrical distributor supplying everything from light bulbs and dimmers to plcs and industrial automation equipment.
Run the metal conduit and plan the bend.